Industrial Facilities
Automated classification and modelling of electrical substations and pipelines
Forest Fire Risks
Study of the risks of forest fires
Railway Gauge & Clearance Study
Study the gauge of a railway infrastructure
Catenary Gauge & Clearance Study
Study the electrical and fire risks on a railway infrastructure
Testimonial
2.13.0.0
2.13.0.0
Since 2015, the use of GIS, BIM and even BIM connected to GIS has been carried out at setec according to needs and uses, with the most sober approach possible and avoiding multiplying technologies. An example is the use of mobile mapping for highway reverse engineering, in collaboration with
One step closer towards digital twins!
2.13.0.0
2.13.0.0
Denis Le Roux setec als